Date of remodel
의견
-
My understanding is that every building has a schedule for "refreshing." In other words, when carpets are replaced, upholstery in the chapel, sisal wallpaper, artwork, etc. This is so it doesn't happen all at one time; easier on the budget. The FM group handles that. So any remodel of FSC would likely happen during one of those scheduled times; which one is totally arbitrary or up to the Stake or FM. My assumption is (and only my assumption) that the larger FSCs out west would get the remodel first. Then it would trickle down to those in the field. But I was also told that it's the Stake Pres who would initiate the remodel with the FM group at any time.
0
이 토론은 잠겼습니다.